Scottie Resources' Drills 14.6 g/t Gold Over 8.07 Metres, Extending Blueberry Zone to Over 550 Metres Strike-Length

VANCOUVER, British Columbia, Sept. 21, 2021 (GLOBE NEWSWIRE) -- Scottie Resources Corp. (“ Scottie ” or the “ Company ”) (TSXV: SCOT) is pleased to report new assays for the Blueberry Zone, where high-grade intercepts extend the structure to both the north and south, increasing the drilled strike length to 550 m. Intercepts include of 14.6 g/t gold over 8.07 metres and 18.4 g/t over 1.54 metres. The Blueberry Zone is located on the Granduc Road, 2 km north-northeast of the past-producing high-grade Scottie Gold Mine, 35 kilometres north of the town of Stewart, BC.

“Drilling last year identified a N-S oriented gold-bearing structure at the Blueberry zone, which was supported by an expansive overlying trend of high-grade surficial sampling,” comments VP Exploration, Thomas Mumford, Ph.D., P.Geo: “We’ve now had the chance to follow up with drilling to test the strike extent. Our results so far indicate that the high-grade structure continues to both the north and south, increasing the drilled strike length from 150 to 550 metres. With assays in hand and the drills still turning, we’ll continue to explore this open structure.”

Table 1: Selected results from new drill assay results (uncut) from the Blueberry Zone.

Drill
Hole
From
(m)
To (m) Width*
(m)
Gold
(g/t)
Silver
(g/t)
SR21-67 119.82 120.23 0.41 7.18 67.60
SR21-76

9.62 18.9 9.28 3.64 1.37
including 9.62 11.16 1.54 18.4 3.17
SR21-77 35.6 40.15 4.55 0.65 24.27
SR21-78

33.9 35.48 1.58 15.7 11.50
and 64.92 65.42 0.50 6.92 6.00
SR21-79 37.38 39.38 2.00 6.56 15.50
SR21-84

52.68 60.75 8.07 14.6 1.79
including 59.87 60.75 0.88 118 13.55

* True thicknesses of mineralized intercepts are undetermined

Blueberry Zone

The Blueberry Zone is located just 2 km northeast of the 100% owned, past-producing Scottie Gold Mine located in British Columbia, Canada’s Golden Triangle region. Historic trenching and channel sampling of the Blueberry Vein include results of 103.94 g/t gold over 1.43 metres, and 203.75 g/t gold over 1.90 metres. Despite high-grade surficial samples and easy road access, the Blueberry Vein had only limited reported drilling prior to the Company’s exploration work. The target was significantly advanced during Scottie’s 2019 drill program when an interval grading 7.44 g/t gold over 34.78 metres was intersected in a new splay off zone of the main Blueberry Vein. The drill results received in 2020, coupled with surficial mapping and sampling suggest that this splay is in fact a major N-S mineralizing structure, of which the Blueberry Vein was only a secondary structure. This near surface zone is much wider than pursued in previous exploration models and drilling in 2021 aims to expand its strike length. The Blueberry Zone is located on the Granduc Road, 20 km north of the Ascot Resources’ Premier Project, which is in the process of refurbishing their mill in anticipation of production in 2022 ( August 10, 2021 ).

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/cd2b5451-afaf-421e-8b41-890c9fcdf4fc

Quality Assurance and Control

Results from samples during the 2021 field season were analyzed at either ALS Laboratory in Vancouver, BC or at SGS Minerals in Burnaby, BC. The sampling program was undertaken under the direction of Dr. Thomas Mumford. A secure chain of custody is maintained in transporting and storing of all samples. Gold was assayed using a fire assay with atomic absorption spectrometry and gravimetric finish when required (+9 g/t Au). Analysis by four acid digestion with multi-element ICP-AES analysis was conducted on all samples with silver and base metal over-limits being re-analyzed by emission spectrometry.

Thomas Mumford, Ph.D., P.Geo and VP Exploration of Scottie, a qualified person under National Instrument 43-101, has reviewed the technical information contained in this news release on behalf of the Company.

ABOUT SCOTTIE RESOURCES CORP.

Scottie owns a 100% interest in the high-grade, past-producing Scottie Gold Mine and Bow properties and has the option to purchase a 100% interest in Summit Lake claims which are contiguous with the Scottie Gold Mine property. Scottie also owns 100% interest in the Georgia Project which contains the high-grade past-producing Georgia River Mine, as well as the Cambria Project properties and the Sulu property. Altogether Scottie Resources holds more than 52,000 ha of mineral claims in the Stewart Mining Camp in the Golden Triangle.

The Company’s focus is on expanding the known mineralization around the past-producing mines while advancing near mine high-grade gold targets, with the purpose of delivering a potential resource. The Company’s focus is on expanding the known mineralization around the past-producing mine while advancing near mine high-grade gold targets, with the purpose of delivering a potential resource.

All of the Company’s properties are located in the area known as the Golden Triangle of British Columbia which is among the world’s most prolific mineralized districts.

Additional Information

Brad Rouke Gordon Robb
President and CEO Business Development
+1 250 877 9902 +1 250 217 2321
brad@scottieresources.com gordon@scottieresources.com

Forward Looking Statements

This news release may contain forward‐looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects”, “plans”, “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential” and similar expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur. Although the Company believes the expectations expressed in such forward‐looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward‐looking statements are based on the beliefs, estimates and opinions of the Company’s management on the date such statements were made. The Company expressly disclaims any intention or obligation to update or revise any forward‐looking statements whether as a result of new information, future events or otherwise.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of TSX Venture Exchange) accepts responsibility for the adequacy of accuracy of this release.


Primary Logo